ProductNetwork MonitoringKuant NMS: open-source monitoring with agentic AI resolution.Configuration ManagementAnsible playbooks: every automated fix is an auditable run.Database ManagementPostgreSQL high availability, tuning and point-in-time recovery.DevOps and AutomationTerraform, Ansible and CI/CD pipelines as reviewable code.
SolutionsPostgreSQL Managed DatabaseHigh availability, tuning and point-in-time recovery.Private Cloud & VirtualisationPrivate and hybrid cloud on Proxmox VE and OpenStack.Network & SecurityNGFW, VPN, IDS/IPS and managed wireless.Identity, Directory & AccessLDAP and Active Directory across Linux and Windows.Mail & CollaborationSelf-hosted mail platforms, or managed Microsoft 365.Licence-Exit MigrationsCosted exits from per-device licensing, run in parallel.DevOps & IaCTerraform, Ansible and CI/CD pipelines as reviewable code.Cyber Security & GRC AuditVAPT, TPRM and security architecture.IT Solutions & Tool StackThe full toolchain, with every licence stated up front.
IntegrationsMonitoring & ObservabilityThe open-source core the platform deploys and reads.DatabasesPostgreSQL HA clusters to a 99.99% availability target.Firewall & SecurityDetection feeds the same resolution pipeline.Agentic AISelf-hosted inference; no telemetry leaves the estate.Commercial EstatesFirewalls, hypervisors and ITSM you already own.
Partners Decoded
CompanyAbout KuantWhy teams run their estate on Kuant.Contact UsTalk to an engineer about your environment.
Get in Touch

Named, costed exits from per-device, per-IP and per-socket licensing, monitoring, DDI and virtualisation, run in parallel with your current stack so checks, thresholds and history survive the move.

  • A like-for-like comparison priced at your real device count, before you commit
  • Parallel run: old and new stacks side by side until the evidence is in
  • Checks, thresholds, dashboards and history preserved, not rebuilt
  • A rollback plan on every cutover

How it fits together

Leave a licence without losing a single check

The new stack is built beside the old one and both run in parallel until the results match. Only then is the old one switched off.

Today

  • SolarWinds / ManageEnginePer-device licensing
  • InfobloxPer-IP licensing
  • VMwarePer-socket licensing

Parallel run

  • Old and new side by side
  • Checks, thresholds and historyCarried over
  • VerifyLike for like
  • Rollback planOn every cutover

After

  • ZabbixMonitoring
  • BIND + Kea + NetBoxDDI
  • Proxmox VEVirtualisation

Three named exits

Each one replaces a recurring licence with an open-source stack we deploy, harden and operate.

SolarWinds / ManageEngine → Zabbix

Monitoring without per-device or per-sensor licences, the Kuant NMS core.

Infoblox → BIND + Kea + NetBox

Enterprise DDI on the open-source components it is built from, DNS, DHCP and IPAM without a per-IP licence.

VMware → Proxmox VE

A costed exit from per-socket repricing, with the storage and backup design done properly.

How a migration runs

The renewal date is the deadline; the parallel run is the safety net.

01

Assess

Inventory at your real device count, a licence-cost model of staying versus moving, and the risks named up front.

02

Parallel build

The new stack is built beside the old one, nothing is switched off, nothing is bet on a promise.

03

Verify

Like-for-like evidence: the same checks firing, the same coverage, side by side, for as long as it takes to trust it.

04

Cutover

A planned window with a rollback path. The old system stays restorable until you sign it off.

05

Decommission & handover

Runbooks, training and documentation handed over; the licence lapses instead of renewing.

Scope it before the renewal, not after

Most exits are scoped 3-6 months before a renewal date, enough time for the parallel run to produce evidence instead of pressure. Bring your renewal quote; we will price the comparison against it.

Use Cases

Cost

Monitoring renewal is due

A like-for-like comparison at your real device count, then a migration that preserves checks, thresholds and history.

Virtualisation

VMware licensing has changed

Per-socket repricing turned a stable platform into a budget problem. The Proxmox exit is staged, tested and reversible.

DDI

DDI renewal is due

Per-IP licensing on DNS/DHCP/IPAM, replaced with BIND, Kea and NetBox, run by us under SLA.

Audit

Audit needs evidence

Coverage, detection-to-resolution times and a Git-backed change trail, produced on demand, before and after the move.

Talk to an engineer about Licence-Exit Migrations

We start with your environment as it actually is: architecture, tooling, gaps, constraints and the outcomes the business is asking for.

Get in Touch